Garment Manufacturing Agreement: Clauses and Sample Wording for Turkey
Nine clauses a garment manufacturing agreement with a Turkish workshop should cover, fill-in sample wording, Turkish default contract rules and a checklist to run before signing.
- Published:
- Updated:
- Fact-checked by:
- Gizem Polat
Key facts
- The Turkish Code of Obligations has no contract type called “fason”; the Court of Cassation has treated contract sewing with client-supplied fabric as a contract for work.
- Contracts need no special form unless the law says so, but a written agreement is the evidence you will want in disputes over lead time, wastage, quality and payment.
- As a rule, the payment term between commercial enterprises is at most 60 days; a longer term needs express agreement and is never allowed if the creditor is an SME (TTK Art. 1530/5).
- The penalty rate and cap for late delivery are set in the contract; a buyer who accepts late delivery without reservation can lose the right to the penalty (TBK Art. 179).
- Between merchants, notices of default and termination must go by notary, registered letter, telegram or KEP (registered email); list KEP addresses in the contract (TTK Art. 18/3).
- The sample clauses are a skeleton, not legal advice; have a lawyer qualified in Turkish law draft or review the agreement.
A garment manufacturing agreement with a Turkish workshop should cover nine areas: scope, materials, samples, lead time and penalties, quality and acceptance, price and payment, subcontracting, confidentiality, and termination and disputes. The Turkish Code of Obligations has no contract type called “fason” (contract manufacturing); where the text is silent, general and contract-for-work rules apply, and they rarely give days, rates or procedures.
This guide explains each clause from the brand's side (the party commissioning the work) and the workshop's side, gives bracketed sample wording to fill in, and ends with a checklist for signing day. Information is valid as of the date of this article (October 9, 2026). The sample wording is a skeleton, not legal advice: have a lawyer qualified in Turkish law draft or review your agreement, and take tax questions to a Turkish accountant. The rules described are Turkish default rules; which law governs your agreement, which forum decides disputes and whether these rules apply to a given order are questions for the agreement and your lawyer. Abbreviations: TBK is the Turkish Code of Obligations (Law No. 6098), TTK the Turkish Commercial Code (Law No. 6102) and HMK the Code of Civil Procedure (Law No. 6100). For the CMT and full-package models and the process as a whole, see contract garment manufacturing.
What does Turkish law say if nothing is written?
Contracts are not bound to any form unless the law provides otherwise (TBK Art. 12, Turkish text), so an agreement made by phone or message is still a contract; the problem is proof and gaps. A person who receives a letter confirming an oral agreement and does not object within eight days is deemed to accept it (TTK Art. 21/3), so confirming orders by email helps, though it does not replace a contract. The 15th Civil Chamber of the Court of Cassation (Yargıtay) has treated contract sewing in which the client supplied the fabric as a contract for work, “eser sözleşmesi” in Turkish (decisions 2018/3366 K. and 2019/1255 K.); your lawyer decides which provisions apply to your relationship. The default rules on duty of care, defect notice and withdrawal are in our contract garment manufacturing guide; the table adds the other defaults a contract has to complete.
| Subject | Default rule of the law | Why write it in the contract? |
|---|---|---|
| Payment due | The price falls due on delivery of the work; with delivery in parts and a price per part, each part's price falls due on its delivery (TBK Art. 479) | Advances, payment terms and plans for partial deliveries are not in the law |
| Default on payment | Between commercial enterprises supplying goods or services, a debtor who misses the contractual date or period is in default without notice (TTK Art. 1530/2) | A written term, invoicing method and interest rate shorten arguments |
| Late-delivery penalty | No ready-made penalty; an agreed one can be claimed even if no loss arose (TBK Arts. 179-180) | Rate, start day and cap can only be set in the contract |
| Order cancellation | The client may terminate if it pays for the part done and compensates all of the contractor's losses (TBK Art. 484) | Cut fabric, prepared materials and idle capacity need a calculation method |
| Loss of materials | If the work is destroyed before delivery by an unforeseeable event, damage to the material falls on whoever supplied it (TBK Art. 483) | Fire, theft or flood: storage and insurance |
Standard terms: if you use a template
A text you prepare alone, in advance, for use in many similar contracts and present to the other side can count as standard terms, “genel işlem koşulları” in Turkish (TBK Art. 20). Standard terms that work against the other side are treated as unwritten if that side was not clearly informed of them, could not learn their content, or did not accept them (Art. 21), and unclear terms are read against the party who drafted them (Art. 23); a note saying “accepted after negotiation” does not by itself remove their character (Art. 20/3). Tekstil Rehberi recommends a common framework text, with the price, lead time, penalty and acceptance clauses negotiated with each workshop and recorded in writing. The same definition can apply to terms a workshop sends you, so have your lawyer read them.
Garment manufacturing agreement: nine clauses with sample wording
The samples are short skeletons; square brackets are the places you fill in. We recommend no rates, day counts or amounts, because they depend on the product, the workshop and the negotiation. The lawyers of both parties should review them.
1. Parties, scope and order form
Write each party's trade name, tax number, address and authorized signatory. If both parties are merchants, notices of default, termination and withdrawal must be made by notary, registered letter, telegram or registered electronic mail (KEP) sent with a secure electronic signature (TTK Art. 18/3), so add KEP and service addresses. Whether the workshop is a merchant (“tacir”) or a tradesman (“esnaf”) also matters: several rules here (TTK Arts. 18/3 and 22, HMK Art. 17) apply only to merchants, and TTK Art. 15 defines tradesmen separately. In the scope, show item by item which stages are contracted out and who supplies what (fabric, lining, interlining, trims, thread, labels, hangers, packaging). Tekstil Rehberi recommends a framework agreement plus an order form for each order giving model, quantity, breakdown, unit price, lead time and tech pack version.
Clause 1 – Scope. [Brand name] (“Brand”) has [Workshop name] (“Workshop”) perform [cutting / sewing / pressing and packing] for the model, quantity and size-color breakdown stated in the attached order form (Annex 1). Fabric and [lining, interlining, labels, packaging] are supplied by the Brand; [sewing thread] is supplied by the Workshop. The items included in the price are listed one by one in Annex 1.
2. Material delivery, fabric account and wastage
If the client supplies the material, the contractor must use it with care, account for it and return what is left (TBK Art. 472/2), and must immediately notify defective material or any circumstance endangering the work (Art. 472/3). The law gives no wastage percentage; it varies with fabric, print or pattern, marker and style, so write it before cutting. Cover dispatch and counting, the incoming check and its notification period, the fabric account (received, cut, wastage, leftover) and its deadline after cutting, and the return of leftovers. Because damage to material destroyed by an unforeseeable event falls on whoever supplied it (Art. 483), also write the workshop's storage and insurance duties when you supply the fabric; the workshop's own fault is assessed separately.
Clause 2 – Material. The Brand delivers the material under a dispatch note by [roll / meter / kg]. The Workshop counts and checks it within [..] business days and notifies missing or defective material in writing within the same period. After cutting, the Workshop gives a written account showing fabric received, cut, wastage and leftover within [..] business days. The accepted wastage is limited to [percentage / the consumption table in Annex 2]; leftover fabric and pieces are returned to the Brand.
3. Sample, pre-production approval and changes
The approved sample is the reference for production. Write who gives the approval, through which channel and on what date, and whether the sample is charged; bulk production should not start without an approved sample and pre-production (PP) approval (for the sample stages, see types of garment samples). Most disputes arise from changes after approval, so make it a rule that any change to the model, quantity, size breakdown or lead time is made only in writing, with its effect on price and time stated in the same document.
4. Lead time, late-delivery penalty and force majeure
State what the lead time means: ready for dispatch at the workshop, or arrival at the brand's warehouse? If the brand supplies the fabric, say the lead time depends on the date the fabric reaches the workshop and extends by the same period if fabric or approval is late; for the workshop this is the most important line.
The parties set the penalty freely (TBK Art. 182/1), and an agreed penalty can be claimed even if no loss arose (Art. 180/1). A court reduces a penalty found excessive on its own motion (Art. 182/3), but a debtor who is a merchant cannot ask for a reduction on that ground (TTK Art. 22); TTK Art. 15 extends only Articles 20 and 53 of the Code (and TMK Art. 950/2) to tradesmen, so ask your lawyer whether the workshop counts as a merchant or a tradesman. A creditor who accepts late performance without reservation may lose the right to the penalty (TBK Art. 179/2): write “right to late-delivery penalty is reserved” on the delivery record. Define force majeure (for example earthquake, fire, official ban), the notice period and the extension.
Clause 4 – Lead time and delay. The delivery date is stated in the order form; delivery means the moment the goods are [ready for dispatch at the Workshop / arrive at the Brand's warehouse]. If the Brand does not give the fabric, trims or approval by the date in the form, the delivery date extends by the same period. If the Workshop passes the delivery date, the Brand may claim a late-delivery penalty of [percentage] of the contract-work price of the delayed goods for each [day] of delay, up to [cap]. A party affected by force majeure notifies the other party in writing within [..] days.
5. Quality, acceptance and defect notice
The acceptance standard is the approved sample, the tech pack and the measurement tolerances. If AQL will be used, state the level, the AQL value, the defect classes, the accept and reject numbers and who does the sampling (see AQL inspection for garments); for outside inspection, see the quality control firms page. A client who does not inspect the work promptly after delivery and notify defects within a suitable period is deemed to have accepted it (TBK Arts. 474, 477). “Suitable period” does not give a number of days, so write the days yourself. Also set rework, sorting or price reduction on rejection, who bears the cost and the new delivery date.
In full-package jobs, where the workshop supplies the fabric, a contractor who supplies the material is liable for its defects like a seller (Art. 472/1). Whether full package counts as a contract for work or a sale is not discussed here; if it counts as a sale, TTK Art. 23/1-c requires merchants to notify an obvious defect within two days of delivery and any other defect within eight days after delivery. Inspect at delivery in full-package jobs and set the period with your lawyer.
Clause 5 – Quality and acceptance. The goods shall conform to the approved sample, the tech pack and the measurement tolerances in Annex 3. The Brand inspects within [..] business days after delivery using [AQL plan: level / AQL value / defect classes] and notifies findings in writing with photographs. Goods not accepted are reworked within [..] business days [at the Workshop's cost]; the Workshop may object in writing to the findings and request a second inspection.
6. Price, payment, invoice and VAT
State the unit price excluding VAT with its scope (cutting, thread, label attaching, pressing and packing, cartons, freight); for the items a quote may include or leave out, see CMT cost per T-shirt in Turkey. This guide gives no price figures, because price varies with quantity, style and fabric. State the currency; if it is not TL, also state which exchange rate and which date apply to invoicing.
The statutory default is payment on delivery of the work (TBK Art. 479), so regulate advances and interim payments by contract. As of the date of this article, under TTK Art. 1530/5 the payment period in supplies of goods and services between commercial enterprises is at most 60 days from the invoice or from acceptance. A longer period may be agreed expressly, but not if the creditor is an SME (or the debtor is a large enterprise), in which case 60 days is the limit. With no written term, default arises without notice 30 days after the invoice is received (Art. 1530/4). If the agreement sets no interest rate, the Central Bank announces one every January (Art. 1530/7): its Communiqué of January 2, 2026 (Official Gazette No. 33125) set 43.00% per year from January 1, 2026, with a minimum compensation amount (“asgari giderim”) of TL 2,020. Whether these rules and that rate apply to a foreign buyer or to a payment in foreign currency is a question for your lawyer. Someone who receives an invoice and does not object within eight days is deemed to accept its content (TTK Art. 21/2).
As of the date of this article, the Turkish VAT General Implementation Communiqué (section I/C-2.1.3.2.7) places contract textile and clothing work under partial withholding, applied by the buyer groups it lists. Write down whether withholding applies and what the invoice will carry; whether a foreign buyer is affected is a question for the workshop's accountant, and where the workshop supplies the fabric the tax nature of the work needs separate assessment. This guide is not tax advice.
Clause 6 – Price and payment. The unit price is [amount, currency] excluding VAT and covers the items in Annex 1. [If the price is not in TL: invoices are issued at the [source] rate of [date].] VAT and withholding apply under the legislation in force on the invoice date. [Percentage] of the price is paid as an advance on order confirmation and the balance within [..] days of the acceptance record; the amount not in dispute is paid. Amounts not paid when due bear default interest at [rate / the rate set by legislation].
7. Subcontracting and the workshop's employees
The law says a contractor may have the work done by someone else if its personal qualities do not matter (TBK Art. 471/3); if the agreement is silent, subcontracting causes disputes. If you allow it, write: written approval, the subcontractor's name, which stage it covers, responsibility staying with the main workshop, and audit access. If you forbid it, write the consequence of a breach. For first screening questions, see how to choose a CMT workshop in Turkey.
Social security registration, workplace safety and child labor are duties of the workshop as an employer: it must notify insured employees to the Social Security Institution before they start work (Law No. 5510 Art. 8) and ensure their occupational health and safety (Law No. 6331 Art. 4), and employing children who have not completed age 15 is prohibited except for narrow exceptions (Labor Law Art. 71). Tekstil Rehberi recommends asking for the registration and premium payment documents and putting a ban on undeclared employment into the agreement. Labor Law Art. 2 makes a principal employer jointly liable to a subcontractor's employees, but it rests on a definition of subcontracting that depends on the facts and is not assessed here; if you are concerned, ask an employment lawyer. If your own customers require a social compliance audit, see BSCI audit in Turkey.
8. Confidentiality, model rights and overproduction
The tech pack, patterns, designs, samples and labels are the brand's work product. Write that they are used only for this order, shown to no third party and never used for another brand's goods; that they are returned, or destroyed under a record, when the job ends; that nothing above the ordered quantity is produced; and that rejects, seconds and leftover goods, labels and parts are counted and delivered or destroyed, never sold. The law protects somewhat but does not replace explicit wording: TTK Art. 55/1-c-1 lists unauthorized use of a work product entrusted to someone, and Art. 55/1-d the unlawful disclosure of production and trade secrets, as unfair competition (remedies in Art. 56). A contractual penalty for breach (TBK Arts. 179-182) lightens the burden of proving loss (Art. 180/1).
Clause 8 – Confidentiality and overproduction. The tech pack, patterns, designs, samples and labels belong to the Brand; they are used only for work under this agreement, shown to no third party and not used for any other brand. No quantity above the order may be produced. Rejects, seconds and leftover goods, labels and parts are counted and delivered to the Brand or, on the Brand's written instruction, destroyed under a record; they may not be sold. The obligation continues for [..] years after the agreement ends. In case of breach the Workshop pays a contractual penalty of [amount / calculation method].
9. Termination, cancellation, disputes and final provisions
Write the grounds for termination (delay beyond a set day, unacceptable quality, non-payment, breach of the subcontracting or confidentiality rules, breach of social security and safety duties) and the consequences (return of material, semi-finished goods, patterns and tech packs, and an account of the work done). Order cancellation is separate: the client may terminate before the work is finished, but only on paying for the part done and compensating the contractor's losses (TBK Art. 484), so tie the cancellation fee to a formula in advance (cut pieces, prepared material, reserved capacity).
Merchants may agree on the competent court by contract: the agreement must be in writing, the legal relationship specified or specifiable, and the court named (HMK Arts. 17, 18/2). Whether you want a Turkish court at all, or another forum such as arbitration, is a question for you and your lawyer. For commercial lawsuits over money claims, compensation, annulment of an objection to enforcement proceedings, negative declaratory actions and restitution, applying to a mediator first is a prerequisite for the lawsuit (TTK Art. 5/A). Also settle copies, entry into force, annexes and written amendment, and ask your accountant whether the agreement is subject to stamp duty (“damga vergisi”) and who pays it.
Clause 9 – Notices and disputes. The parties have stated their service and KEP addresses in the agreement heading; notices of default and termination are made to these addresses by the methods listed in TTK Art. 18/3. In a dispute the parties first meet in writing within [..] days; if it is not resolved, the courts and enforcement offices of [city] are competent. The agreement may be amended only by a written document signed by both parties' authorized signatories.
Brand and workshop read the same clause differently
A one-sided text is weak in both negotiation and dispute; knowing each party's priority moves the text toward balance.
| Clause | Brand (commissioning party) | Workshop |
|---|---|---|
| Material | Incoming count, fabric account, return of leftovers | Fabric arriving on time and complete; lead time extending if fabric is late |
| Sample and changes | The approved sample as the reference | Changes after approval reflected in price and time |
| Lead time | Late-delivery penalty, right to partial delivery | Cap on the penalty, force majeure, the brand's own delays |
| Quality | A clear accept-reject standard, right to rework | Inspection and objection periods, right to a second inspection |
| Payment | Payment after acceptance, the disputed part set aside | Advance, an upper limit on the term, default interest |
| Subcontracting | Written permission and notice | Permitted subcontracting when capacity is exceeded |
| Confidentiality | Protection of the model, patterns and leftover goods | A reasonable scope and duration |
| Termination and cancellation | Right to terminate for serious breach | Payment for work done and preparation costs on cancellation (TBK Art. 484) |
Company directory
Looking for manufacturers in this field?
Browse companies in the related categories or get quotes from several companies with one form.
Do you manufacture or offer services in this field?
Checklist before you sign
- Are trade names, tax numbers, addresses, KEP addresses and signatories correct?
- Is there an order form for every order (model, quantity, breakdown, unit price, lead time, tech pack version)?
- Is it written who supplies what and what the price includes?
- Are the incoming check, fabric account, wastage limit, return of leftovers, storage and insurance settled?
- Are there an approved sample, an approval authority and a change procedure?
- Are the lead-time definition, the extension for late fabric, the penalty (rate, start day, cap) and force majeure written?
- Are the acceptance standard, AQL, defect classes, inspection and objection periods and the rejection procedure written?
- Is the price exclusive of VAT; are currency, rate date, withholding and invoice form settled with an accountant; are advance, term and interest written?
- Are the subcontracting permission and the social security and safety documents settled?
- Are confidentiality, return of tech packs and patterns, overproduction and the ban on selling seconds written?
- Are the termination grounds, cancellation fee, competent court, copies, entry into force and stamp duty settled?
- Has a lawyer qualified in Turkish law reviewed the text, and an accountant the tax clauses?
Next steps
Screen the workshop against criteria and compare quotes on the same scope before the agreement; the agreement records the outcome. See our guides on how to choose a CMT workshop in Turkey and on CMT cost per T-shirt in Turkey, and browse firms that do contract sewing on the CMT sewing workshops page; verify each firm yourself. This guide outlines how to write the agreement in general terms; ask a lawyer about your own agreement and an accountant about its tax effect. Legislation and Central Bank rates change; check the current texts and rates before signing.
Frequently asked questions
Does a garment manufacturing agreement with a Turkish workshop have to be in writing?
Under Article 12 of the Turkish Code of Obligations (TBK), contracts need no particular form unless the law says otherwise, and the provisions covered in this article contain no special form requirement for contract manufacturing. A written agreement is still the best evidence in disputes about lead time, wastage, quality and payment. Under Article 21/3 of the Turkish Commercial Code (TTK), a person who receives a letter confirming an oral agreement and does not object within eight days is deemed to accept it, so confirming orders by email also helps.
How is a late-delivery penalty written in a Turkish manufacturing agreement, and will a court reduce it?
The parties set the penalty freely (TBK Art. 182/1), and once agreed it can be claimed even if no loss arose (Art. 180/1). A court reduces an excessive penalty on its own motion (Art. 182/3), but a debtor who is a merchant cannot ask for a reduction on that ground (TTK Art. 22). Accepting a late delivery without reservation may cost you the right to the penalty (TBK Art. 179/2), so note the reservation on the delivery record. Set the rate and cap with your lawyer; this article gives none.
What is the maximum payment term for a contract manufacturing job in Turkey?
As of October 9, 2026, under Article 1530/5 of the Turkish Commercial Code, the payment period agreed in supplies of goods and services between commercial enterprises is at most 60 days from receipt of the invoice or completion of the acceptance procedure. A longer period may be agreed expressly if it is not grossly unfair to the creditor, but if the creditor is an SME (or the debtor is a large enterprise) it cannot exceed 60 days. With no written term, default arises without notice 30 days after the invoice is received. Whether this applies to an order from a foreign buyer is a question for your lawyer.
Can I use a manufacturing agreement template from the internet as it is?
A template does not work until the job-specific clauses are filled in: who supplies which material, which stages are contracted out, lead time and payment. A text prepared alone in advance for use in many contracts and presented to the other side can also count as standard terms: terms that work against the other side and were not clearly disclosed are treated as unwritten, and unclear terms are read against the drafter (TBK Arts. 20-25). Have a lawyer review the text.
What should I do first if a dispute with the workshop arises?
Follow the procedure in the agreement, in writing. If both parties are merchants, notices of default, termination and withdrawal must be made by notary, registered letter, telegram or KEP sent with a secure electronic signature (TTK Art. 18/3); notices made by other methods may not count as formal notice. For commercial lawsuits over money claims, applying to a mediator before filing suit is a prerequisite (TTK Art. 5/A). Ask a lawyer to guide the process.
Who bears the loss if fabric I supplied is damaged or lost at the workshop?
Under Article 483 of the TBK, if the work is destroyed before delivery by an unforeseeable event, damage to the material falls on the party who supplied it. When you supply the fabric, write the workshop's storage and insurance duties into the agreement; the workshop's own fault is assessed separately. The contractor must also account for the material, return what is left (Art. 472/2) and immediately notify defective material or any circumstance endangering the work (Art. 472/3).
Sources (9)
- Turkish Code of Obligations, Law No. 6098, Articles 12, 20-25 (standard terms), 179-182 (contractual penalty) and 470-486 (contract for work) (Turkish text; accessed October 9, 2026)
- Turkish Commercial Code, Law No. 6102, Articles 5/A (mediation), 15, 18/3 (method of notice), 21 (invoices and confirmation letters), 22 (reduction of penalty), 23/1-c (notice of defects in commercial sale), 55-56 (unfair competition) and 1530 (late payment) (Turkish text; accessed October 9, 2026)
- Central Bank of the Republic of Türkiye Communiqué (default interest rate and minimum compensation amount for late payment in 2026, under TTK Art. 1530/7), Official Gazette, January 2, 2026, No. 33125 (Turkish text)
- Code of Civil Procedure, Law No. 6100, Articles 17-18 (jurisdiction agreements) (Turkish text; accessed October 9, 2026)
- Labor Law No. 4857, Article 2 (principal employer-subcontractor relationship) and Article 71 (minimum age and employment of children) (Turkish text; accessed October 9, 2026)
- Social Insurance and General Health Insurance Law No. 5510, Article 8 (notification of insured persons) (Turkish text; accessed October 9, 2026)
- Occupational Health and Safety Law No. 6331, Article 4 (employer's general obligation) (Turkish text; accessed October 9, 2026)
- Court of Cassation (Yargıtay) 15th Civil Chamber, 2017/2037 E., 2018/3366 K. (24.09.2018) and 2018/3517 E., 2019/1255 K. (20.03.2019) (contract-for-work relationship in contract sewing; Yargıtay case-law search, Turkish)
- Turkish VAT General Implementation Communiqué (Official Gazette, April 26, 2014, No. 28983), Revenue Administration (GİB) legislation page, section I/C-2.1.3.2.7 (contract textile and clothing work; Turkish text; accessed October 9, 2026)
Author and fact-checking
Written by
Contract Manufacturing and Workshop Editor
Zeynep Arslan is Tekstil Rehberi's contract manufacturing and workshop editor. She writes practical guides on CMT pricing, contracts, tax obligations such as VAT withholding, setting up a workshop and incentives, and takes tax and regulatory details from official sources in force on the date of writing.
Content by Zeynep ArslanFact-checked by: Gizem Polat
This content was prepared by the Tekstil Rehberi editorial team. Before publication, our verification editor checked its figures, dates and sources against primary sources.
Spotted an error? Email us at [email protected] How we work →
Related articles
How to Choose a CMT Workshop in Turkey: 10 Criteria
How to choose a CMT workshop in Turkey: ten criteria, the documents to request, a visit checklist, a scorecard for comparing quotes and low-risk first-order steps.
Contract Garment Manufacturing: CMT vs Full Package and How to Work With a Factory
How contract garment manufacturing works: CMT versus full package (FOB), the tech pack, factory screening and lead-time checks, default contract rules under Turkish law, and acceptance on delivery.
CMT Cost per T-Shirt in Turkey: How to Calculate and Compare Quotes
How a Turkish workshop prices CMT T-shirt sewing: the minute-cost formula, what a quote leaves out, a worked example in Turkish lira and a checklist for comparing quotes.